Shift handoff log
- Site
- Date
- Shift
- Outgoing lead
- Incoming lead
| Time | Area or job | What happened | Still open | Next step | Noted by |
|---|---|---|---|---|---|
Outgoing lead: signature and date
Incoming lead: signature and date
The outgoing lead writes a row for each open item at the end of a shift, and the incoming lead reads the log before starting work. Keep each note short.
At the end of a shift the lead knows things the next lead does not: the door that will not lock, the job that stopped halfway, the client who called. This log puts them on paper so the next shift does not find them out again.
When: At the end of each shift, before the outgoing lead leaves. The incoming lead reads it before starting work.
Start a new log for each shift. Write the site, date, shift and both lead names at the top. One log covers one shift change.
Give each open item its own row. Unfinished work, broken equipment, access problems, keys, low supplies and client complaints each get a row.
Say what happens next. In Next step, write the first thing the incoming crew should do about the item, and who to call.
Read it together and sign. The incoming lead reads every row, asks about anything unclear, and both leads sign.
Shift handoff log
| Time | Area or job | What happened | Still open | Next step | Noted by |
|---|---|---|---|---|---|
Outgoing lead: signature and date
Incoming lead: signature and date